Construction of Energy Projects
During the last four decades, the Group possesses a leading role in the construction of energy projects.
  • 170 MW
    installed capacity in the non - interconnected network
  • 350 MW
    installed capacity in the interconnected network
  • FIRST CHP PLANT
    IN GREECE (EPC)

Copelouzos Group possesses a leading role in the construction of energy projects and is active in the supply and installation of equipment in large power plants.

DAMCO ENERGY S.A. has developed Hydroelectric Plants, Diesel – fired Plants, Lignite – fired Plants, Combined – Cycle Diesel – Fired and Gas – Fired Turbine Plants.

Indicative projects undertaken by the Group in this sector are the following:

Construction of a 300 MW Lignite Fire Power Plant in the Florina region (SES Melitis).

Two Hydro Power Plants 2 x 60 MW and 2 x 80 MW in the area of Sikias and Pefkofito respectively, at the Achelous river (under contract).

In the field of cogeneration, the supply of the first CHP, natural gas – fired plant ever installed in our country, in the ceramic industry KOTHALI SA. The capacity of the plant is 1.2 MWe.

Supply of CHP, biogas – fired equipment for the Ano Liossia Landfill. The capacity of the plant is 4 x 2.4 MWe.